Fresno Hoover High School Hybrid is a 1 MW Batteries asset in CAISO (California), currently Operating.
Fresno Hoover High School Hybrid is reported in California since 2020 under Forefront Power, LLC. Available operating and financial measures include 16.4% capacity factor and 2 GWh annual generation; $7.6/MWh reported energy value.
- Location
- Fresno, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Forefront Power, LLC
- Operator
- Forefront Power, LLC
- Grid
- CAISO (California)
- Plant ID
- 63421
What stands out
Fresno Hoover High School Hybrid is a 1 MW Batteries asset in California with status Operating.
Latest annual operating measures report 16.4% capacity factor and 2 GWh annual generation.
Available financial measures include $7.6/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #793 of 992
- National rank
- #6783 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.