Query
Fresno Hoover High School Hybrid
Type
Entity Briefing
Entity
Fresno Hoover High School Hybrid
State
MI
Technology
hybrid-electric
Generated
2026-10-18T02:58:23.957Z

Briefing on Fresno Hoover High School Hybrid

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2020
Operating since
2
Generators
16.4%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Fresno Hoover High School Hybrid is a 1 MW Batteries asset in CAISO (California), currently Operating.

Fresno Hoover High School Hybrid is reported in California since 2020 under Forefront Power, LLC. Available operating and financial measures include 16.4% capacity factor and 2 GWh annual generation; $7.6/MWh reported energy value.

Location
Fresno, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Forefront Power, LLC
Operator
Forefront Power, LLC
Grid
CAISO (California)
Plant ID
63421

What stands out

1

Fresno Hoover High School Hybrid is a 1 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 16.4% capacity factor and 2 GWh annual generation.

3

Available financial measures include $7.6/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#793 of 992
National rank
#6783 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.