Fresno Bullard High School Hybrid is a 2 MW Batteries asset in CAISO (California), currently Operating.
Fresno Bullard High School Hybrid is reported in California since 2020 under Forefront Power, LLC. Available operating and financial measures include 15.0% capacity factor and 2 GWh annual generation; $2.4/MWh reported energy value.
- Location
- Fresno, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Forefront Power, LLC
- Operator
- Forefront Power, LLC
- Grid
- CAISO (California)
- Plant ID
- 63420
What stands out
Fresno Bullard High School Hybrid is a 2 MW Batteries asset in California with status Operating.
Latest annual operating measures report 15.0% capacity factor and 2 GWh annual generation.
Available financial measures include $2.4/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #693 of 992
- National rank
- #6450 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.