Query
Fresno Bullard High School Hybrid
Type
Entity Briefing
Entity
Fresno Bullard High School Hybrid
State
MI
Technology
hybrid
Generated
2026-10-11T03:59:26.007Z

Briefing on Fresno Bullard High School Hybrid

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2020
Operating since
2
Generators
15.0%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Fresno Bullard High School Hybrid is a 2 MW Batteries asset in CAISO (California), currently Operating.

Fresno Bullard High School Hybrid is reported in California since 2020 under Forefront Power, LLC. Available operating and financial measures include 15.0% capacity factor and 2 GWh annual generation; $2.4/MWh reported energy value.

Location
Fresno, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Forefront Power, LLC
Operator
Forefront Power, LLC
Grid
CAISO (California)
Plant ID
63420

What stands out

1

Fresno Bullard High School Hybrid is a 2 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 15.0% capacity factor and 2 GWh annual generation.

3

Available financial measures include $2.4/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#693 of 992
National rank
#6450 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.