Query
Fresno Bullard High School Hybrid
Type
Entity Briefing
Entity
Fresno Bullard High School Hybrid
State
MI
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Fresno Bullard High School Hybrid

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2020
Operating since
2
Generators
15.0%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Fresno Bullard High School Hybrid is a 2 MW Batteries asset in CAISO (California), currently Operating.

Fresno Bullard High School Hybrid is reported in California since 2020 under Forefront Power, LLC. Available operating and financial measures include 15.0% capacity factor and 2 GWh annual generation; $2.4/MWh reported energy value.

Location
Fresno, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Forefront Power, LLC
Operator
Forefront Power, LLC
Grid
CAISO (California)
Plant ID
63420

What stands out

1

Fresno Bullard High School Hybrid is a 2 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 15.0% capacity factor and 2 GWh annual generation.

3

Available financial measures include $2.4/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#693 of 992
National rank
#6450 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.