Query
French Riviera Storage
Type
Entity Briefing
Entity
French Riviera Storage
Generated
2026-10-19T04:52:11.611Z

Briefing on French Riviera Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
75 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-05-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

French Riviera Storage is a 75 MW Battery project in Texas, currently active.

Arana Creek Battery Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-01.

Queue ID
ERCOT-24INR0516
Location
Kleberg, Texas
Technology
Battery
Developer
Arana Creek Battery Storage LLC
Market / region
ERCOT
Point of interconnection
5646 Riviera Substation 69kV

What stands out

1

French Riviera Storage is a 75 MW Battery project in Texas with status active.

2

Arana Creek Battery Storage LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-05-01.

4

Latest linked story: “EDF Renewables President and CEO Tristan Grimbert” (SmartBrief, 2021-04-12).

Market and operating context

Queue date
2023-02-09
Proposed COD
2028-05-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

French Riviera Storage — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0516
LocationKleberg, Texas
TechnologyBattery
DeveloperArana Creek Battery Storage LLC
Market / regionERCOT
Point of interconnection5646 Riviera Substation 69kV
Queue date2023-02-09
Proposed COD2028-05-01