French Riviera Storage is a 75 MW Battery project in Texas, currently active.
Arana Creek Battery Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-01.
- Queue ID
- ERCOT-24INR0516
- Location
- Kleberg, Texas
- Technology
- Battery
- Developer
- Arana Creek Battery Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- 5646 Riviera Substation 69kV
What stands out
French Riviera Storage is a 75 MW Battery project in Texas with status active.
Arana Creek Battery Storage LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-05-01.
Latest linked story: “EDF Renewables President and CEO Tristan Grimbert” (SmartBrief, 2021-04-12).
Market and operating context
- Queue date
- 2023-02-09
- Proposed COD
- 2028-05-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.