Fremont - Kato Rd is a 1 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
Fremont - Kato Rd is reported in California since 2016 under Tesla Inc.. Available operating and financial measures include 18.5% capacity factor and 2 GWh annual generation; $26.3/MWh reported energy value.
- Location
- Alameda, California
- Technology
- Solar Photovoltaic
- Owner / parent
- Tesla Inc.
- Operator
- Tesla Inc.
- Grid
- CAISO (California)
- Plant ID
- 65131
What stands out
Fremont - Kato Rd is a 1 MW Solar Photovoltaic asset in California with status Operating.
Latest annual operating measures report 18.5% capacity factor and 2 GWh annual generation.
Available financial measures include $26.3/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #783 of 992
- National rank
- #6750 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.