Query
FreeState Crooked Post Solar I
Type
Entity Briefing
Entity
FreeState Crooked Post Solar I
Generated
2026-10-12T11:23:11.609Z

Briefing on FreeState Crooked Post Solar I

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2023
Operating since
1
Generators
25.7%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

FreeState Crooked Post Solar I is a 2 MW Solar Photovoltaic asset in SPP (Southwest Power Pool), currently Operating.

FreeState Crooked Post Solar I is reported in Kansas since 2023 under Evergy. Available operating and financial measures include 25.7% capacity factor and 4 GWh annual generation; $24.2/MWh reported energy value.

Location
Shawnee, Kansas
Technology
Solar Photovoltaic
Owner / parent
Evergy
Operator
Evergy Kansas Central, Inc
Grid
SPP (Southwest Power Pool)
Plant ID
66883

What stands out

1

FreeState Crooked Post Solar I is a 2 MW Solar Photovoltaic asset in Kansas with status Operating.

2

Latest annual operating measures report 25.7% capacity factor and 4 GWh annual generation.

3

Available financial measures include $24.2/MWh energy value.

4

Latest linked story: “Evergy's green energy plan fuels debate in Kansas, Missouri” (KMBC, 2021-06-14).

Market and operating context

ISO / market
SPP (Southwest Power Pool)
Balancing authority
Southwest Power Pool
NERC region
MRO
State rank
#15 of 41
National rank
#6391 of 7,971

Why it matters

For this asset in SPP (Southwest Power Pool), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.