Query
Franklin County Wind Farm
Type
Entity Briefing
Entity
Franklin County Wind Farm
Technology
wind
Generated
2026-10-18T08:13:25.630Z

Briefing on Franklin County Wind Farm

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
99 MW
Capacity
Operating
Current status
2012
Operating since
1
Generators
22.0%
Capacity factor
191 GWh
Annual generation
Briefing/plantOperating

Franklin County Wind Farm is a 99 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.

Franklin County Wind Farm is reported in Iowa since 2012 under Alliant Energy. Available operating and financial measures include 22.0% capacity factor and 191 GWh annual generation; $2278/kW reported CapEx.

Location
Franklin, Iowa
Technology
Onshore Wind Turbine
Owner / parent
Alliant Energy
Operator
Interstate Power and Light Co
Grid
MISO (Midcontinent)
Plant ID
57844

What stands out

1

Franklin County Wind Farm is a 99 MW Onshore Wind Turbine asset in Iowa with status Operating.

2

Latest annual operating measures report 22.0% capacity factor and 191 GWh annual generation.

3

Available financial measures include $4.0/MWh OpEx, $2278/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#57 of 123
National rank
#761 of 1,442

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.