Briefing/projectactive
FPS Panton Solar is a 50 MW Solar project in Vermont, currently active.
The reported queue phase is IA Executed. Proposed COD is 2027-12-01.
- Queue ID
- ISO-NE-807
- Location
- Addison, Vermont
- Technology
- Solar
- Market / region
- ISO-NE
- Point of interconnection
- Vergennes 115 kV Substation
What stands out
1
FPS Panton Solar is a 50 MW Solar project in Vermont with status active.
2
The reported queue phase is IA Executed; proposed COD is 2027-12-01.
Market and operating context
- Queue date
- 2018-12-13
- Proposed COD
- 2027-12-01
- IA status
- IA Executed
- Study phase
- IA Executed
- Service type
- ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.