Query
FPL Energy Montezuma Winds LLC
Type
Entity Briefing
Entity
FPL Energy Montezuma Winds LLC
Generated
2026-10-18T01:11:06.811Z

Briefing on FPL Energy Montezuma Winds LLC

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
37 MW
Capacity
Operating
Current status
2010
Operating since
1
Generators
26.4%
Capacity factor
85 GWh
Annual generation
Briefing/plantOperating

FPL Energy Montezuma Winds LLC is a 37 MW Onshore Wind Turbine asset in CAISO (California), currently Operating.

FPL Energy Montezuma Winds LLC is reported in California since 2010 under NextEra Energy. Available operating and financial measures include 26.4% capacity factor and 85 GWh annual generation; $1895/kW reported CapEx.

Location
Solano, California
Technology
Onshore Wind Turbine
Owner / parent
NextEra Energy
Operator
FPL Energy Montezuma Wind
Grid
CAISO (California)
Plant ID
57201

What stands out

1

FPL Energy Montezuma Winds LLC is a 37 MW Onshore Wind Turbine asset in California with status Operating.

2

Latest annual operating measures report 26.4% capacity factor and 85 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

Latest linked story: “Why I Can’t Stop Buying This Dividend Stock” (24/7 Wall St., 2026-05-25).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#59 of 116
National rank
#1009 of 1,442

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.