Query
Fowler Ranch Storage
Type
Entity Briefing
Entity
Fowler Ranch Storage
Generated
2026-10-19T14:17:28.527Z

Briefing on Fowler Ranch Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
26 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Fowler Ranch Storage is a 26 MW Battery project in Texas, currently active.

Crane BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-30.

Queue ID
ERCOT-23INR0308
Location
Crane, Texas
Technology
Battery
Developer
Crane BESS, LLC
Market / region
ERCOT
Point of interconnection
76025 Castle Mountain 138kV

What stands out

1

Fowler Ranch Storage is a 26 MW Battery project in Texas with status active.

2

Crane BESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-06-30.

Market and operating context

Queue date
2021-06-21
Proposed COD
2027-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Fowler Ranch Storage — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0308
LocationCrane, Texas
TechnologyBattery
DeveloperCrane BESS, LLC
Market / regionERCOT
Point of interconnection76025 Castle Mountain 138kV
Queue date2021-06-21
Proposed COD2027-06-30