Briefing on Fort Loudoun
Entity BriefingGenerated Jun 26, 2026·Data as of Jun 26
4
Generators
153 MW
Capacity
54.4%
Capacity Factor
732 GWh
Annual Generation
Overview
- Project Name: Fort Loudoun Dam Turbine Upgrade (WATE 6 On Your Side, 2025-12-09)
- Location: Loudon County, Tennessee, on the Tennessee River
- Status: Operational (WATE 6 On Your Side, 2025-12-09), operating since 1943
- Owner/Operator: Tennessee Valley Authority
- Company: Fort Loudoun Electric Cooperative (advocateanddemocrat.com, 2022-04-12)
Fleet Details
- Technology: Conventional Hydroelectric
- Capacity: 153 MW
- Generators: 4 units
- Capacity Factor: 54.4%
- Annual Generation: 732 GWh
Recent Performance and Financials
- Recent Generation (2024): October: 71 GWh, November: 59 GWh, December: 68 GWh
- Capital Expenditure (CapEx): $2294/kW (eia_agg_cost)
Fort Loudoun Dam is a long-standing and significant hydroelectric asset for the Tennessee Valley Authority, consistently contributing to the grid with a solid capacity factor. Recent turbine upgrades suggest ongoing investment to maintain its operational efficiency and low-cost energy production.