Query
Forrest City- Prison Site
Type
Entity Briefing
Entity
Forrest City- Prison Site
Generated
2026-10-18T00:04:02.668Z

Briefing on Forrest City- Prison Site

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2021
Operating since
1
Generators
21.0%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Forrest City- Prison Site is a 1 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Forrest City- Prison Site is reported in Arkansas since 2021 under Greenbacker Renewable Energy Corporation. Available operating and financial measures include 21.0% capacity factor and 2 GWh annual generation; $25.8/MWh reported energy value.

Location
St Francis, Arkansas
Technology
Solar Photovoltaic
Owner / parent
Greenbacker Renewable Energy Corporation
Operator
Greenbacker Renewable Energy Corporation
Grid
MISO (Midcontinent)
Plant ID
64261

What stands out

1

Forrest City- Prison Site is a 1 MW Solar Photovoltaic asset in Arkansas with status Operating.

2

Latest annual operating measures report 21.0% capacity factor and 2 GWh annual generation.

3

Available financial measures include $25.8/MWh energy value.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
State rank
#60 of 80
National rank
#7561 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.