Query
Forks of Butte Hydro Project
Type
Entity Briefing
Entity
Forks of Butte Hydro Project
Technology
hydro
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Forks of Butte Hydro Project

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

15 MW
Capacity
Operating
Current status
1992
Operating since
1
Generators
51.9%
Capacity factor
66 GWh
Annual generation
Briefing/plantOperating

Forks of Butte Hydro Project is a 15 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

Forks of Butte Hydro Project is reported in California since 1992 under Hypower Energy, LLC. Available operating and financial measures include 51.9% capacity factor and 66 GWh annual generation; $2294/kW reported CapEx.

Location
Butte, California
Technology
Conventional Hydroelectric
Owner / parent
Hypower Energy, LLC
Operator
Hypower Energy, LLC
Grid
CAISO (California)
Plant ID
50350

What stands out

1

Forks of Butte Hydro Project is a 15 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 51.9% capacity factor and 66 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#101 of 247
National rank
#557 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.