Query
Foote Creek Rim
Type
Entity Briefing
Entity
Foote Creek Rim
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Foote Creek Rim

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

135 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
54.0%
Capacity factor
636 GWh
Annual generation
Briefing/plantOperating

Foote Creek Rim is a 135 MW Onshore Wind Turbine asset in Wyoming, currently Operating.

Foote Creek Rim is reported in Wyoming since 2024 under Berkshire Hathaway. Available operating and financial measures include 54.0% capacity factor and 636 GWh annual generation.

Location
Carbon, Wyoming
Technology
Onshore Wind Turbine
Owner / parent
Berkshire Hathaway
Operator
PacifiCorp
Grid
PacifiCorp - East
Plant ID
67916

What stands out

1

Foote Creek Rim is a 135 MW Onshore Wind Turbine asset in Wyoming with status Operating.

2

Latest annual operating measures report 54.0% capacity factor and 636 GWh annual generation.

3

Latest linked story: “Rocky Mountain Power installing new wind turbines at Foote Creek Rim and Rock River” (Wyo4News, 2023-06-09).

Market and operating context

Balancing authority
PacifiCorp - East
NERC region
WECC
State rank
#15 of 31
National rank
#585 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.