Query
Foote Creek Rim
Type
Entity Briefing
Entity
Foote Creek Rim
Generated
2026-10-12T07:56:29.450Z

Briefing on Foote Creek Rim

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
135 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
54.0%
Capacity factor
636 GWh
Annual generation
Briefing/plantOperating

Foote Creek Rim is a 135 MW Onshore Wind Turbine asset in Wyoming, currently Operating.

Foote Creek Rim is reported in Wyoming since 2024 under Berkshire Hathaway. Available operating and financial measures include 54.0% capacity factor and 636 GWh annual generation.

Location
Carbon, Wyoming
Technology
Onshore Wind Turbine
Owner / parent
Berkshire Hathaway
Operator
PacifiCorp
Grid
PacifiCorp - East
Plant ID
67916

What stands out

1

Foote Creek Rim is a 135 MW Onshore Wind Turbine asset in Wyoming with status Operating.

2

Latest annual operating measures report 54.0% capacity factor and 636 GWh annual generation.

3

Latest linked story: “Rocky Mountain Power installing new wind turbines at Foote Creek Rim and Rock River” (Wyo4News, 2023-06-09).

Market and operating context

Balancing authority
PacifiCorp - East
NERC region
WECC
State rank
#15 of 31
National rank
#585 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.