Query
Folsom SP and CSP Sacramento
Type
Entity Briefing
Entity
Folsom SP and CSP Sacramento
ISO/RTO
isone
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Folsom SP and CSP Sacramento

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

1 MW
Capacity
Operating
Current status
2019
Operating since
1
Generators
20.1%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

Folsom SP and CSP Sacramento is a 1 MW Solar Photovoltaic asset in California, currently Operating.

Folsom SP and CSP Sacramento is reported in California since 2019 under Ecoplexus, Inc. Available operating and financial measures include 20.1% capacity factor and 2 GWh annual generation; $25.6/MWh reported energy value.

Location
Sacramento, California
Technology
Solar Photovoltaic
Owner / parent
Ecoplexus, Inc
Operator
Ecoplexus, Inc
Grid
Balancing Authority of Northern California
Plant ID
61698

What stands out

1

Folsom SP and CSP Sacramento is a 1 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 20.1% capacity factor and 2 GWh annual generation.

3

Available financial measures include $25.6/MWh energy value.

Market and operating context

Balancing authority
Balancing Authority of Northern California
NERC region
WECC
State rank
#812 of 992
National rank
#6845 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.