Briefing/projectactive
Flying Kite Bess is a 105 MW Solar+Battery project in Texas, currently active.
Flying Kite BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-30.
- Queue ID
- ERCOT-27INR0274
- Location
- Zavala, Texas
- Technology
- Solar+Battery
- Developer
- Flying Kite BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap the 138 kV La Pryor (#8008) - Poblano (#8009)
What stands out
1
Flying Kite Bess is a 105 MW Solar+Battery project in Texas with status active.
2
Flying Kite BESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-30.
Market and operating context
- Queue date
- 2024-07-30
- Proposed COD
- 2027-12-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.