Query
Flying Kite Bess
Type
Entity Briefing
Entity
Flying Kite Bess
State
TN
Technology
battery
Generated
2026-10-20T00:06:11.905Z

Briefing on Flying Kite Bess

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
105 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-12-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Flying Kite Bess is a 105 MW Solar+Battery project in Texas, currently active.

Flying Kite BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-30.

Queue ID
ERCOT-27INR0274
Location
Zavala, Texas
Technology
Solar+Battery
Developer
Flying Kite BESS, LLC
Market / region
ERCOT
Point of interconnection
Tap the 138 kV La Pryor (#8008) - Poblano (#8009)

What stands out

1

Flying Kite Bess is a 105 MW Solar+Battery project in Texas with status active.

2

Flying Kite BESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-30.

Market and operating context

Queue date
2024-07-30
Proposed COD
2027-12-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Flying Kite Bess — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0274
LocationZavala, Texas
TechnologySolar+Battery
DeveloperFlying Kite BESS, LLC
Market / regionERCOT
Point of interconnectionTap the 138 kV La Pryor (#8008) - Poblano (#8009)
Queue date2024-07-30
Proposed COD2027-12-30