Flower Valley II is a 101 MW Batteries asset in ERCOT (Texas), currently Operating.
Flower Valley II is reported in Texas since 2022 under Flower Valley II. Available operating and financial measures include -1.0% capacity factor and -9 GWh annual generation; $1205/kW reported CapEx.
- Location
- Reeves, Texas
- Technology
- Batteries
- Owner / parent
- Flower Valley II
- Operator
- Flower Valley II
- Grid
- ERCOT (Texas)
- Plant ID
- 66007
What stands out
Flower Valley II is a 101 MW Batteries asset in Texas with status Operating.
Latest annual operating measures report -1.0% capacity factor and -9 GWh annual generation.
Available financial measures include $1205/kW CapEx.
Latest linked story: “Jupiter Power’s Flower Valley II energy storage facility comes online in Texas” (pv magazine USA, 2022-04-04).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #156 of 344
- National rank
- #340 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.