Query
Flint
Type
Entity Briefing
Entity
Flint
Generated
2026-10-17T12:32:29.618Z

Briefing on Flint

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
200 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Flint is a 200 MW Batteries asset in PJM Interconnection, currently Under construction.

Flint is reported in Ohio under Flint. Available operating and financial measures include $1361/kW reported CapEx.

Location
Franklin, Ohio
Technology
Batteries
Owner / parent
Flint
Operator
Flint
Grid
PJM Interconnection
Plant ID
68911

What stands out

1

Flint is a 200 MW Batteries asset in Ohio with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “Combined Notice of Filings #2” (Federal Register (FERC), 2026-08-05).

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#1 of 7
National rank
#208 of 994

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.