Briefing/plantUnder construction
Flint is a 200 MW Batteries asset in PJM Interconnection, currently Under construction.
Flint is reported in Ohio under Flint. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Franklin, Ohio
- Technology
- Batteries
- Owner / parent
- Flint
- Operator
- Flint
- Grid
- PJM Interconnection
- Plant ID
- 68911
What stands out
1
Flint is a 200 MW Batteries asset in Ohio with status Under construction.
2
Available financial measures include $1361/kW CapEx.
3
Latest linked story: “Combined Notice of Filings #2” (Federal Register (FERC), 2026-08-05).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #1 of 7
- National rank
- #208 of 994
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.