Briefing/projectactive
FLIFER Solar I is a 84 MW Solar project in Texas, currently active.
FLIFER LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-04-15.
- Queue ID
- ERCOT-24INR0538
- Location
- Ward, Texas
- Technology
- Solar
- Developer
- FLIFER LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197)
What stands out
1
FLIFER Solar I is a 84 MW Solar project in Texas with status active.
2
FLIFER LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-04-15.
Market and operating context
- Queue date
- 2023-03-08
- Proposed COD
- 2027-04-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.