Query
Five Wells Solar Center - Hybrid
Type
Entity Briefing
Entity
Five Wells Solar Center - Hybrid
Technology
solar
Generated
2026-10-18T04:21:02.007Z

Briefing on Five Wells Solar Center - Hybrid

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
618 MW
Capacity
Operating
Current status
2023
Operating since
2
Generators
13.3%
Capacity factor
723 GWh
Annual generation
Briefing/plantOperating

Five Wells Solar Center - Hybrid is a 618 MW Batteries asset in ERCOT (Texas), currently Operating.

Five Wells Solar Center - Hybrid is reported in Texas since 2023 under ENGIE. Available operating and financial measures include 13.3% capacity factor and 723 GWh annual generation; $20.3/MWh reported energy value.

Location
Bell, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
ENGIE
Operator
Five Wells Solar Center, LLC
Grid
ERCOT (Texas)
Plant ID
66420

What stands out

1

Five Wells Solar Center - Hybrid is a 618 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report 13.3% capacity factor and 723 GWh annual generation.

3

Available financial measures include $20.3/MWh energy value.

4

Latest linked story: “Engie’s Billion-Dollar Tax Equity Financing” (Brazil Energy Insight, 2024-03-04).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#7 of 378
National rank
#20 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.