FirstEnergy includes 3.3 GW of operating capacity in the current result.
7 operating plants span 1 states. No linked queue projects were returned in the current result. Solar is the largest operating technology group at 50 MW.
- Coverage
- 7 plants across 1 states
- Largest asset
- FirstEnergy Harrison Power Station · 2.1 GW
- Leading technology
- Solar · 50 MW
What stands out
7 operating plants total 3.3 GW across 1 states.
Solar is the largest operating technology group at 50 MW across 5 plants.
FirstEnergy Harrison Power Station is the largest returned operating asset at 2.1 GW.
Latest linked story: “POWERGEN 2027 announces keynote lineup spanning supply chain strategy, grid security and reliability” (Power Engineering, 2026-07-09).
Market and operating context
- Largest state footprint
- West Virginia · 3.3 GW
- Technology concentration
- Solar represents 50 MW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.