Firestone Walker Brewery - Phase 1 is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
Firestone Walker Brewery - Phase 1 is reported in California since 2020 under SkyHigh 2 Solar. Available operating and financial measures include 23.7% capacity factor and 3 GWh annual generation; $10.4/MWh reported energy value.
- Location
- San Luis Obispo, California
- Technology
- Solar Photovoltaic
- Owner / parent
- SkyHigh 2 Solar
- Operator
- SkyHigh 2 Solar
- Grid
- CAISO (California)
- Plant ID
- 64391
What stands out
Firestone Walker Brewery - Phase 1 is a 2 MW Solar Photovoltaic asset in California with status Operating.
Latest annual operating measures report 23.7% capacity factor and 3 GWh annual generation.
Available financial measures include $10.4/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #686 of 992
- National rank
- #6422 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.