Query
Firestone Walker Brewery - Phase 1
Type
Entity Briefing
Entity
Firestone Walker Brewery - Phase 1
Generated
2026-10-17T12:39:38.053Z

Briefing on Firestone Walker Brewery - Phase 1

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2020
Operating since
1
Generators
23.7%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

Firestone Walker Brewery - Phase 1 is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Firestone Walker Brewery - Phase 1 is reported in California since 2020 under SkyHigh 2 Solar. Available operating and financial measures include 23.7% capacity factor and 3 GWh annual generation; $10.4/MWh reported energy value.

Location
San Luis Obispo, California
Technology
Solar Photovoltaic
Owner / parent
SkyHigh 2 Solar
Operator
SkyHigh 2 Solar
Grid
CAISO (California)
Plant ID
64391

What stands out

1

Firestone Walker Brewery - Phase 1 is a 2 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 23.7% capacity factor and 3 GWh annual generation.

3

Available financial measures include $10.4/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#686 of 992
National rank
#6422 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.