Briefing on Firefly Fields Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Firefly Fields Solar is a 101 MW Solar+Battery project in Texas, currently active.

Firefly Fields Energy Center LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.

Queue ID
ERCOT-29INR0085
Location
Colorado, Texas
Technology
Solar+Battery
Developer
Firefly Fields Energy Center LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV <57640> <Rock Island> - <7258> <Glidden>

What stands out

1

Firefly Fields Solar is a 101 MW Solar+Battery project in Texas with status active.

2

Firefly Fields Energy Center LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-30.

4

Latest linked story: “Ohio Supreme Court approves Licking County solar project” (WOSU Public Media, 2025-05-01).

Market and operating context

Queue date
2025-01-13
Proposed COD
2028-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Firefly Fields Solar — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0085
LocationColorado, Texas
TechnologySolar+Battery
DeveloperFirefly Fields Energy Center LLC
Market / regionERCOT
Point of interconnectionTap 138 kV <57640> <Rock Island> - <7258> <Glidden>
Queue date2025-01-13
Proposed COD2028-09-30