Query
Fighting Jays Solar Project
Type
Entity Briefing
Entity
Fighting Jays Solar Project
Technology
solar
Generated
2026-10-10T12:57:45.728Z

Briefing on Fighting Jays Solar Project

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
228 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
22.8%
Capacity factor
454 GWh
Annual generation
Briefing/plantOperating

Fighting Jays Solar Project is a 228 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Fighting Jays Solar Project is reported in Texas since 2022 under Copenhagen Infrastructure Partners Holding. Available operating and financial measures include 22.8% capacity factor and 454 GWh annual generation; $20.5/MWh reported energy value.

Location
Fort Bend, Texas
Technology
Solar Photovoltaic
Owner / parent
Copenhagen Infrastructure Partners Holding
Operator
AP Solar 2, LLC
Grid
ERCOT (Texas)
Plant ID
62945

What stands out

1

Fighting Jays Solar Project is a 228 MW Solar Photovoltaic asset in Texas with status Operating.

2

Latest annual operating measures report 22.8% capacity factor and 454 GWh annual generation.

3

Available financial measures include $20.5/MWh energy value.

4

Latest linked story: “Reevaluating hailstorm damage at the Fighting Jays solar project” (PV Tech, 2025-01-14).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#122 of 378
National rank
#302 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.