Fighting Jays Solar is a 351 MW Solar project in Texas, currently active.
AP Solar Holdings, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-01-06.
- Queue ID
- ERCOT-21INR0278
- Location
- Fort Bend, Texas
- Technology
- Solar
- Developer
- AP Solar Holdings, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 44000 WA Parish - 44200 Hillje c64
What stands out
Fighting Jays Solar is a 351 MW Solar project in Texas with status active.
AP Solar Holdings, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2026-01-06.
Latest linked story: “Reevaluating hailstorm damage at the Fighting Jays solar project” (PV Tech, 2025-01-14).
Market and operating context
- Queue date
- 2019-03-26
- Proposed COD
- 2026-01-06
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.