Briefing on Fighting Jays Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
351 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-01-06
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Fighting Jays Solar is a 351 MW Solar project in Texas, currently active.

AP Solar Holdings, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-01-06.

Queue ID
ERCOT-21INR0278
Location
Fort Bend, Texas
Technology
Solar
Developer
AP Solar Holdings, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 44000 WA Parish - 44200 Hillje c64

What stands out

1

Fighting Jays Solar is a 351 MW Solar project in Texas with status active.

2

AP Solar Holdings, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-01-06.

4

Latest linked story: “Reevaluating hailstorm damage at the Fighting Jays solar project” (PV Tech, 2025-01-14).

Market and operating context

Queue date
2019-03-26
Proposed COD
2026-01-06
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Fighting Jays Solar — verified asset snapshot

FieldValue
Queue IDERCOT-21INR0278
LocationFort Bend, Texas
TechnologySolar
DeveloperAP Solar Holdings, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 44000 WA Parish - 44200 Hillje c64
Queue date2019-03-26
Proposed COD2026-01-06