Query
Field Marshal Storage
Type
Entity Briefing
Entity
Field Marshal Storage
Generated
2026-10-20T00:19:18.513Z

Briefing on Field Marshal Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
151 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-05-07
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Field Marshal Storage is a 151 MW Battery project in Texas, currently active.

Field Marshal Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-05-07.

Queue ID
ERCOT-28INR0290
Location
Erath, Texas
Technology
Battery
Developer
Field Marshal Storage LLC
Market / region
ERCOT
Point of interconnection
Dublin (1636) - Fullhouse (1652) 138kV

What stands out

1

Field Marshal Storage is a 151 MW Battery project in Texas with status active.

2

Field Marshal Storage LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-05-07.

Market and operating context

Queue date
2025-03-24
Proposed COD
2029-05-07
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Field Marshal Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0290
LocationErath, Texas
TechnologyBattery
DeveloperField Marshal Storage LLC
Market / regionERCOT
Point of interconnectionDublin (1636) - Fullhouse (1652) 138kV
Queue date2025-03-24
Proposed COD2029-05-07