Fernandina Beach Mill is a 97 MW Wood/Wood Waste Biomass asset in Florida, currently Operating.
Fernandina Beach Mill is reported in Florida since 1982 under Westrock. Available operating and financial measures include 69.7% capacity factor and 592 GWh annual generation; $3495/kW reported CapEx.
- Location
- Nassau, Florida
- Technology
- Wood/Wood Waste Biomass
- Owner / parent
- Westrock
- Operator
- WestRock, Fernandina Beach
- Grid
- JEA
- Plant ID
- 10202
What stands out
Fernandina Beach Mill is a 97 MW Wood/Wood Waste Biomass asset in Florida with status Operating.
Latest annual operating measures report 69.7% capacity factor and 592 GWh annual generation.
Available financial measures include $3495/kW CapEx.
Latest linked story: “Dissecting RYAM's ridiculous $6.6 million demand” (Fernandina Observer, 2025-09-09).
Market and operating context
- Balancing authority
- JEA
- NERC region
- SERC
- State rank
- #1 of 3
- National rank
- #14 of 60
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.