Query
Fern Solar LLC
Type
Entity Briefing
Entity
Wood Fern Wind
State
CA
Generated
2026-10-05T17:38:06.712Z

Briefing on Wood Fern Wind

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
197 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2029-06-07
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Wood Fern Wind is a 197 MW Wind project in Texas, currently active.

Wood Fern Wind LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-07.

Queue ID
ERCOT-28INR0274
Location
Van Zandt, Texas
Technology
Wind
Developer
Wood Fern Wind LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV #2432 Tri-Corner to #3102 Tyler Grande

What stands out

1

Wood Fern Wind is a 197 MW Wind project in Texas with status active.

2

Wood Fern Wind LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-06-07.

Market and operating context

Queue date
2025-01-31
Proposed COD
2029-06-07
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Wood Fern Wind — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0274
LocationVan Zandt, Texas
TechnologyWind
DeveloperWood Fern Wind LLC
Market / regionERCOT
Point of interconnectionTap 345kV #2432 Tri-Corner to #3102 Tyler Grande
Queue date2025-01-31
Proposed COD2029-06-07