Fermi is a 1.3 GW Nuclear asset in MISO (Midcontinent), currently Operating.
Fermi is reported in Michigan since 1966 under DTE Energy. Available operating and financial measures include 88.7% capacity factor and 9948 GWh annual generation.
- Location
- Monroe, Michigan
- Technology
- Nuclear, Petroleum Liquids
- Owner / parent
- DTE Energy
- Operator
- DTE Electric Company
- Grid
- MISO (Midcontinent)
- Plant ID
- 1729
What stands out
Fermi is a 1.3 GW Nuclear asset in Michigan with status Operating.
Latest annual operating measures report 88.7% capacity factor and 9948 GWh annual generation.
Latest linked story: “Fire at DTE Energy's Fermi 2 nuclear plant leads to temporary shutdown” (Detroit Free Press, 2026-06-10).
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- RFC
- State rank
- #2 of 3
- National rank
- #40 of 58
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.