Query
Fenner Wind
Type
Entity Briefing
Entity
Fenner Wind
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Fenner Wind

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

30 MW
Capacity
Operating
Current status
2001
Operating since
1
Generators
24.5%
Capacity factor
64 GWh
Annual generation
Briefing/plantOperating

Fenner Wind is a 30 MW Onshore Wind Turbine asset in NYISO (New York), currently Operating.

Fenner Wind is reported in New York since 2001 under Enel. Available operating and financial measures include 24.5% capacity factor and 64 GWh annual generation; $1895/kW reported CapEx.

Location
Madison, New York
Technology
Onshore Wind Turbine
Owner / parent
Enel
Operator
CHI Energy Inc
Grid
NYISO (New York)
Plant ID
55790

What stands out

1

Fenner Wind is a 30 MW Onshore Wind Turbine asset in New York with status Operating.

2

Latest annual operating measures report 24.5% capacity factor and 64 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

Latest linked story: “Fenner has been proud home of wind power but greets new renewable plans skeptically” (waer.org, 2026-03-16).

Market and operating context

ISO / market
NYISO (New York)
Balancing authority
New York Independent System Operator
NERC region
NPCC
State rank
#36 of 43
National rank
#1035 of 1,442

Why it matters

For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.