Briefing on Felix Storage

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-07-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Felix Storage is a 101 MW Solar+Battery project in Texas, currently active.

Felix 1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-07-31.

Queue ID
ERCOT-27INR0009
Location
Wilbarger, Texas
Technology
Solar+Battery
Developer
Felix 1, LLC
Market / region
ERCOT
Point of interconnection
The 345 kV Riley Substation (#6101); AEP

What stands out

1

Felix Storage is a 101 MW Solar+Battery project in Texas with status active.

2

Felix 1, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-07-31.

Market and operating context

Queue date
2023-01-03
Proposed COD
2027-07-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Felix Storage — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0009
LocationWilbarger, Texas
TechnologySolar+Battery
DeveloperFelix 1, LLC
Market / regionERCOT
Point of interconnectionThe 345 kV Riley Substation (#6101); AEP
Queue date2023-01-03
Proposed COD2027-07-31