Query
Falls County Storage
Type
Entity Briefing
Entity
Falls County Storage
Technology
battery
Generated
2026-10-05T06:09:32.941Z

Briefing on Falls County Storage

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
60 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-10-01
Proposed COD
Briefing/projectactive

Falls County Storage is a 60 MW Battery project in Texas, currently active.

Aurora Solar LLC is the reported developer. Proposed COD is 2028-10-01.

Queue ID
ERCOT-29INR0105
Location
Falls, Texas
Technology
Battery
Developer
Aurora Solar LLC
Market / region
ERCOT
Point of interconnection
3711 BALSW 345kV

What stands out

1

Falls County Storage is a 60 MW Battery project in Texas with status active.

2

Aurora Solar LLC is the reported developer.

3

proposed COD is 2028-10-01.

4

Latest linked story: “National Grid Renewables breaks ground on 150-MW solar + storage project in Texas” (Solar Power World, 2022-10-20).

Market and operating context

Queue date
2025-04-29
Proposed COD
2028-10-01

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Falls County Storage — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0105
LocationFalls, Texas
TechnologyBattery
DeveloperAurora Solar LLC
Market / regionERCOT
Point of interconnection3711 BALSW 345kV
Queue date2025-04-29
Proposed COD2028-10-01