Briefing on Eytcheson Ranches Solar

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
76 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-01-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Eytcheson Ranches Solar is a 76 MW Solar project in Texas, currently active.

Gransolar Group (GRS) is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-01-01.

Queue ID
ERCOT-24INR0120
Location
Navarro, Texas
Technology
Solar
Developer
Gransolar Group (GRS)
Market / region
ERCOT
Point of interconnection
Tap 69kV 186 Navarro Mills – 107 Prairie Hill

What stands out

1

Eytcheson Ranches Solar is a 76 MW Solar project in Texas with status active.

2

Gransolar Group (GRS) is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-01-01.

Market and operating context

Queue date
2021-09-14
Proposed COD
2028-01-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Eytcheson Ranches Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0120
LocationNavarro, Texas
TechnologySolar
DeveloperGransolar Group (GRS)
Market / regionERCOT
Point of interconnectionTap 69kV 186 Navarro Mills – 107 Prairie Hill
Queue date2021-09-14
Proposed COD2028-01-01