Query
Expressway Solar C2
Type
Entity Briefing
Entity
Expressway Solar C2
Generated
2026-10-13T01:52:59.390Z

Briefing on Expressway Solar C2

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2014
Operating since
1
Generators
25.3%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

Expressway Solar C2 is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Expressway Solar C2 is reported in California since 2014 under AES Distributed Energy. Available operating and financial measures include 25.3% capacity factor and 3 GWh annual generation; $10.0/MWh reported energy value.

Location
San Bernardino, California
Technology
Solar Photovoltaic
Owner / parent
AES Distributed Energy
Operator
AES Distributed Energy
Grid
CAISO (California)
Plant ID
58763

What stands out

1

Expressway Solar C2 is a 2 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 25.3% capacity factor and 3 GWh annual generation.

3

Available financial measures include $10.0/MWh energy value.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#727 of 992
National rank
#6468 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.