Query
Estonian Storage
Type
Entity Briefing
Entity
Estonian Storage
Generated
2026-10-19T23:31:39.729Z

Briefing on Estonian Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
103 MW
Proposed capacity
suspended
Current status
Other
Technology
ERCOT
Market / region
2022-12-13
Proposed COD
Facility Study
Queue phase
Briefing/projectsuspended

Estonian Storage is a 103 MW Other project in Texas, currently suspended.

249RD 8ME is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2022-12-13.

Queue ID
ERCOT-22INR0291
Location
Delta, Texas
Technology
Other
Developer
249RD 8ME
Market / region
ERCOT
Point of interconnection
6834 Enloe Sw 138kV

What stands out

1

Estonian Storage is a 103 MW Other project in Texas with status suspended.

2

249RD 8ME is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2022-12-13.

4

Latest linked story: “Enel North America completes 202-MW solar + storage project in Texas” (Solar Power World, 2025-02-06).

Market and operating context

Queue date
2020-01-29
Proposed COD
2022-12-13
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Estonian Storage — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0291
LocationDelta, Texas
TechnologyOther
Developer249RD 8ME
Market / regionERCOT
Point of interconnection6834 Enloe Sw 138kV
Queue date2020-01-29
Proposed COD2022-12-13