Escondido Energy Storage is a 30 MW Batteries asset in CAISO (California), currently Out of service.
Escondido Energy Storage is reported in California since 2017 under Sempra Energy. Available operating and financial measures include -0.1% capacity factor and -0 GWh annual generation; $1587/kW reported CapEx.
- Location
- San Diego, California
- Technology
- Batteries
- Owner / parent
- Sempra Energy
- Operator
- San Diego Gas & Electric Co
- Grid
- CAISO (California)
- Plant ID
- 60570
What stands out
Escondido Energy Storage is a 30 MW Batteries asset in California with status Out of service.
Latest annual operating measures report -0.1% capacity factor and -0 GWh annual generation.
Available financial measures include $1587/kW CapEx.
1 linked queue projects represent 33 MW of proposed capacity.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #111 of 202
- National rank
- #499 of 994
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.