Query
Escondido BESS
Type
Entity Briefing
Entity
Escondido BESS
State
TN
Technology
battery
Generated
2026-10-20T01:51:31.730Z

Briefing on Escondido BESS

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
10 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-04-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Escondido BESS is a 10 MW Battery project in Texas, currently active.

Regis Escondido is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-04-30.

Queue ID
ERCOT-25INR0593
Location
Maverick, Texas
Technology
Battery
Developer
Regis Escondido
Market / region
ERCOT
Point of interconnection
Station Name: ESCONDIDO TSP Station Code: ESCONDID Load Transformer Name: LOAD2 Bus #: 8260 Voltage in kV (Transmission Level): 138 kV

What stands out

1

Escondido BESS is a 10 MW Battery project in Texas with status active.

2

Regis Escondido is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-04-30.

Market and operating context

Proposed COD
2026-04-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Escondido BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0593
LocationMaverick, Texas
TechnologyBattery
DeveloperRegis Escondido
Market / regionERCOT
Point of interconnectionStation Name: ESCONDIDO TSP Station Code: ESCONDID Load Transformer Name: LOAD2 Bus #: 8260 Voltage in kV (Transmission Level): 138 kV
Proposed COD2026-04-30
IA statusIA Executed