Briefing/projectactive
Erin Solar is a 203 MW Solar project in Texas, currently active.
Erin Solar is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-12-31.
- Queue ID
- ERCOT-23INR0058
- Location
- Wharton, Texas
- Technology
- Solar
- Developer
- Erin Solar
- Market / region
- ERCOT
- Point of interconnection
- 44040 Bailey 345 kV
What stands out
1
Erin Solar is a 203 MW Solar project in Texas with status active.
2
Erin Solar is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2029-12-31.
4
Latest linked story: “In Minnesota, Xcel Energy looks to mimic power plant with solar and storage networks” (Minnesota Reformer, 2024-08-28).
Market and operating context
- Queue date
- 2020-07-24
- Proposed COD
- 2029-12-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.