Query
Erin Solar
Type
Entity Briefing
Entity
Erin Solar
Generated
2026-10-17T07:05:47.828Z

Briefing on Erin Solar

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
203 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Erin Solar is a 203 MW Solar project in Texas, currently active.

Erin Solar is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-12-31.

Queue ID
ERCOT-23INR0058
Location
Wharton, Texas
Technology
Solar
Developer
Erin Solar
Market / region
ERCOT
Point of interconnection
44040 Bailey 345 kV

What stands out

1

Erin Solar is a 203 MW Solar project in Texas with status active.

2

Erin Solar is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2029-12-31.

4

Latest linked story: “In Minnesota, Xcel Energy looks to mimic power plant with solar and storage networks” (Minnesota Reformer, 2024-08-28).

Market and operating context

Queue date
2020-07-24
Proposed COD
2029-12-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Erin Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0058
LocationWharton, Texas
TechnologySolar
DeveloperErin Solar
Market / regionERCOT
Point of interconnection44040 Bailey 345 kV
Queue date2020-07-24
Proposed COD2029-12-31