Query
Erika BESS
Type
Entity Briefing
Entity
Erika BESS
State
TN
Technology
battery
Generated
2026-10-19T15:32:33.498Z

Briefing on Erika BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Erika BESS is a 100 MW Solar+Battery project in Texas, currently active.

Erika Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-01.

Queue ID
ERCOT-27INR0531
Location
Kaufman, Texas
Technology
Solar+Battery
Developer
Erika Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)

What stands out

1

Erika BESS is a 100 MW Solar+Battery project in Texas with status active.

2

Erika Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-07-01.

Market and operating context

Queue date
2025-06-19
Proposed COD
2029-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Erika BESS — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0531
LocationKaufman, Texas
TechnologySolar+Battery
DeveloperErika Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)
Queue date2025-06-19
Proposed COD2029-07-01