Query
Enterprise MN - Hu's on First CSG
Type
Entity Briefing
Entity
Enterprise MN - Hu's on First CSG
State
MN
Generated
2026-10-11T08:04:01.871Z

Briefing on Enterprise MN - Hu's on First CSG

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Enterprise MN - Hu's on First CSG is a 1 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.

Enterprise MN - Hu's on First CSG is reported in Minnesota since 2025 under Standard Solar. Available operating and financial measures include $1606/kW reported CapEx.

Location
Rice, Minnesota
Technology
Solar Photovoltaic
Owner / parent
Standard Solar
Operator
Standard Solar
Grid
MISO (Midcontinent)
Plant ID
69307

What stands out

1

Enterprise MN - Hu's on First CSG is a 1 MW Solar Photovoltaic asset in Minnesota with status Operating.

2

Available financial measures include $1606/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
State rank
#288 of 549
National rank
#7583 of 7,971

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Enterprise MN - Hu's on First CSG — verified asset snapshot

FieldValue
LocationRice, Minnesota
TechnologySolar Photovoltaic
Owner / parentStandard Solar
OperatorStandard Solar
GridMISO (Midcontinent)
Plant ID69307
ISO / marketMISO (Midcontinent)
State rank#288 of 549