Enloe Medical - Chico is a 2 MW Other Natural Gas asset in CAISO (California), currently Operating.
Enloe Medical - Chico is reported in California since 2021 under Bloom Energy. Available operating and financial measures include 89.1% capacity factor and 13 GWh annual generation; $920/kW reported CapEx.
- Location
- Butte, California
- Technology
- Other Natural Gas
- Owner / parent
- Bloom Energy
- Operator
- Bloom Energy
- Grid
- CAISO (California)
- Plant ID
- 65210
What stands out
Enloe Medical - Chico is a 2 MW Other Natural Gas asset in California with status Operating.
Latest annual operating measures report 89.1% capacity factor and 13 GWh annual generation.
Available financial measures include $920/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #255 of 303
- National rank
- #1815 of 2,025
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.