EMWD - Moreno Valley RWRF is a 2 MW Solar Photovoltaic asset in CAISO (California), currently Operating.
EMWD - Moreno Valley RWRF is reported in California since 2021 under SkyHigh 2 Solar. Available operating and financial measures include 26.2% capacity factor and 6 GWh annual generation; $10.9/MWh reported energy value.
- Location
- Riverside, California
- Technology
- Solar Photovoltaic
- Owner / parent
- SkyHigh 2 Solar
- Operator
- SkyHigh 2 Solar
- Grid
- CAISO (California)
- Plant ID
- 64406
What stands out
EMWD - Moreno Valley RWRF is a 2 MW Solar Photovoltaic asset in California with status Operating.
Latest annual operating measures report 26.2% capacity factor and 6 GWh annual generation.
Available financial measures include $10.9/MWh energy value.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #577 of 992
- National rank
- #5067 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.