Elm City BESS is a 20 MW Batteries asset in North Carolina, currently Under construction.
Elm City BESS is reported in North Carolina under Duke Energy. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Wilson, North Carolina
- Technology
- Batteries
- Owner / parent
- Duke Energy
- Operator
- Duke Energy Progress - (NC)
- Plant ID
- 69444
What stands out
Elm City BESS is a 20 MW Batteries asset in North Carolina with status Under construction.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Duke Energy Carolinas, LLC; Notice of Intent To Prepare an Environmental Assessment” (Federal Register (FERC), 2026-05-21).
Market and operating context
- State rank
- #7 of 44
- National rank
- #535 of 994
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.