Query
Elkhorn Battery Energy Storage System
Type
Entity Briefing
Entity
Elkhorn Battery Energy Storage System
Technology
battery
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Elkhorn Battery Energy Storage System

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

183 MW
Capacity
Out of service
Current status
2022
Operating since
1
Generators
-0.1%
Capacity factor
-2 GWh
Annual generation
Briefing/plantOut of service

Elkhorn Battery Energy Storage System is a 183 MW Batteries asset in CAISO (California), currently Out of service.

Elkhorn Battery Energy Storage System is reported in California since 2022 under Pacific Gas & Electric Co.. Available operating and financial measures include -0.1% capacity factor and -2 GWh annual generation; $1205/kW reported CapEx.

Location
Monterey, California
Technology
Batteries
Owner / parent
Pacific Gas & Electric Co.
Operator
Pacific Gas & Electric Co.
Grid
CAISO (California)
Plant ID
62564

What stands out

1

Elkhorn Battery Energy Storage System is a 183 MW Batteries asset in California with status Out of service.

2

Latest annual operating measures report -0.1% capacity factor and -2 GWh annual generation.

3

Available financial measures include $1205/kW CapEx.

4

Latest linked story: “PG&E delays recommissioning of California BESS adjacent to fire-hit Moss Landing project to next year” (Energy-Storage.News, 2025-08-28).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#37 of 202
National rank
#229 of 994

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.