Query
ELION ENERGY STORAGE
Type
Entity Briefing
Entity
ELION ENERGY STORAGE
Technology
battery
Generated
2026-10-06T13:06:53.768Z

Briefing on ELION ENERGY STORAGE

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
302 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2034-05-26
Proposed COD
C14
Queue phase
Briefing/projectactive

ELION ENERGY STORAGE is a 302 MW Battery project in California, currently active.

The reported queue phase is C14. Proposed COD is 2034-05-26.

Queue ID
CAISO-2064
Location
Los Angeles, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Antelope ValleySubstation 230 kV

What stands out

1

ELION ENERGY STORAGE is a 302 MW Battery project in California with status active.

2

The reported queue phase is C14; proposed COD is 2034-05-26.

3

Latest linked story: “Eolian Secures $463M Financing for Texas’ Largest Battery Storage Project, Padua 2 & 3” (SolarQuarter, 2025-10-09).

Market and operating context

Queue date
2021-04-15
Proposed COD
2034-05-26
IA status
IA Executed
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

ELION ENERGY STORAGE — verified asset snapshot

FieldValue
Queue IDCAISO-2064
LocationLos Angeles, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionAntelope ValleySubstation 230 kV
Queue date2021-04-15
Proposed COD2034-05-26
IA statusIA Executed