Query
Eleven Mile Solar Center
Type
Entity Briefing
Entity
Eleven Mile Solar Center
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Eleven Mile Solar Center

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

600 MW
Capacity
Operating
Current status
2024
Operating since
2
Generators
15.1%
Capacity factor
793 GWh
Annual generation
Briefing/plantOperating

Eleven Mile Solar Center is a 600 MW Batteries asset in Arizona, currently Operating.

Eleven Mile Solar Center is reported in Arizona since 2024 under Ørsted. Available operating and financial measures include 15.1% capacity factor and 793 GWh annual generation.

Location
Pinal, Arizona
Technology
Batteries, Solar Photovoltaic
Owner / parent
Ørsted
Operator
Eleven Mile Solar Center, LLC
Grid
Salt River Project
Plant ID
66263

What stands out

1

Eleven Mile Solar Center is a 600 MW Batteries asset in Arizona with status Operating.

2

Latest annual operating measures report 15.1% capacity factor and 793 GWh annual generation.

3

Latest linked story: “Ørsted completes 600MW solar and storage project in the US” (Enlit World, 2025-10-18).

Market and operating context

Balancing authority
Salt River Project
NERC region
WECC
State rank
#7 of 61
National rank
#34 of 994

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.