Briefing/projectactive
Eldora Solar is a 201 MW Solar+Battery project in Texas, currently active.
Advanced Power is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-07-02.
- Queue ID
- ERCOT-24INR0337
- Location
- Matagorda, Texas
- Technology
- Solar+Battery
- Developer
- Advanced Power
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 5915 South Texas Project – 44200 Hillje Ckt 1
What stands out
1
Eldora Solar is a 201 MW Solar+Battery project in Texas with status active.
2
Advanced Power is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-07-02.
4
Latest linked story: “Sol Systems picks EPC contractor for 209-MWdc solar project in Texas” (Renewables Now, 2025-11-05).
Market and operating context
- Queue date
- 2022-06-10
- Proposed COD
- 2028-07-02
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.