Query
Eland Solar & Storage Center, Phase 2 Hy
Type
Entity Briefing
Entity
Eland Solar & Storage Center, Phase 2 Hy
State
MD
Generated
2026-10-19T07:58:10.076Z

Briefing on Eland Solar & Storage Center, Phase 2 Hy

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
350 MW
Capacity
Operating
Current status
2025
Operating since
2
Generators
16.8%
Capacity factor
260 GWh
Annual generation
Briefing/plantOperating

Eland Solar & Storage Center, Phase 2 Hy is a 350 MW Batteries asset in California, currently Operating.

Eland Solar & Storage Center, Phase 2 Hy is reported in California since 2025 under 69SV 8me LLC. Available operating and financial measures include 16.8% capacity factor and 260 GWh annual generation; $1361/kW reported CapEx.

Location
Kern, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
69SV 8me LLC
Operator
69SV 8me LLC
Grid
Los Angeles Department of Water and Power
Plant ID
61169

What stands out

1

Eland Solar & Storage Center, Phase 2 Hy is a 350 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 16.8% capacity factor and 260 GWh annual generation.

3

Available financial measures include $1361/kW CapEx.

4

Latest linked story: “Arevon Brings $2-Billion California Solar-Plus-Storage Project Online” (POWER Magazine, 2025-08-07).

Market and operating context

Balancing authority
Los Angeles Department of Water and Power
NERC region
WECC
State rank
#23 of 992
National rank
#109 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.