Eland Solar & Storage Center, Phase 1 Hy is a 460 MW Batteries asset in California, currently Operating.
Eland Solar & Storage Center, Phase 1 Hy is reported in California since 2024 under 68SF 8me LLC. Available operating and financial measures include 17.0% capacity factor and 684 GWh annual generation.
- Location
- Kern, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- 68SF 8me LLC
- Operator
- 68SF 8me LLC
- Grid
- Los Angeles Department of Water and Power
- Plant ID
- 61168
What stands out
Eland Solar & Storage Center, Phase 1 Hy is a 460 MW Batteries asset in California with status Operating.
Latest annual operating measures report 17.0% capacity factor and 684 GWh annual generation.
Latest linked story: “Major clean power plant serving L.A. goes fully online in Kern County” (Los Angeles Times, 2025-08-06).
Market and operating context
- Balancing authority
- Los Angeles Department of Water and Power
- NERC region
- WECC
- State rank
- #12 of 992
- National rank
- #59 of 7,971
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.