Query
Eland Solar & Storage Center, Phase 1 Hy
Type
Entity Briefing
Entity
Eland Solar & Storage Center, Phase 1 Hy
State
MD
Generated
2026-10-17T10:26:39.233Z

Briefing on Eland Solar & Storage Center, Phase 1 Hy

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
460 MW
Capacity
Operating
Current status
2024
Operating since
2
Generators
17.0%
Capacity factor
684 GWh
Annual generation
Briefing/plantOperating

Eland Solar & Storage Center, Phase 1 Hy is a 460 MW Batteries asset in California, currently Operating.

Eland Solar & Storage Center, Phase 1 Hy is reported in California since 2024 under 68SF 8me LLC. Available operating and financial measures include 17.0% capacity factor and 684 GWh annual generation.

Location
Kern, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
68SF 8me LLC
Operator
68SF 8me LLC
Grid
Los Angeles Department of Water and Power
Plant ID
61168

What stands out

1

Eland Solar & Storage Center, Phase 1 Hy is a 460 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 17.0% capacity factor and 684 GWh annual generation.

3

Latest linked story: “Major clean power plant serving L.A. goes fully online in Kern County” (Los Angeles Times, 2025-08-06).

Market and operating context

Balancing authority
Los Angeles Department of Water and Power
NERC region
WECC
State rank
#12 of 992
National rank
#59 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.