El Nido Facility is a 13 MW Wood/Wood Waste Biomass asset in CAISO (California), currently Out of service.
El Nido Facility is reported in California since 2008 under Merced Power LLC. Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $3495/kW reported CapEx.
- Location
- Merced, California
- Technology
- Wood/Wood Waste Biomass
- Owner / parent
- Merced Power LLC
- Operator
- Merced Power LLC
- Grid
- CAISO (California)
- Plant ID
- 56707
What stands out
El Nido Facility is a 13 MW Wood/Wood Waste Biomass asset in California with status Out of service.
Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.
Available financial measures include $3495/kW CapEx.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #20 of 24
- National rank
- #83 of 104
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.