Query
El Molino Solar SLF
Type
Entity Briefing
Entity
El Molino Solar SLF
Generated
2026-10-19T22:01:22.247Z

Briefing on El Molino Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-09-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

El Molino Solar SLF is a 201 MW Solar+Battery project in Texas, currently active.

El Molino Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-01.

Queue ID
ERCOT-25INR0321
Location
Webb, Texas
Technology
Solar+Battery
Developer
El Molino Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 80439 LaQuinta - 8297 Bruni 8297

What stands out

1

El Molino Solar SLF is a 201 MW Solar+Battery project in Texas with status active.

2

El Molino Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-09-01.

Market and operating context

Queue date
2023-01-17
Proposed COD
2027-09-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

El Molino Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0321
LocationWebb, Texas
TechnologySolar+Battery
DeveloperEl Molino Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 80439 LaQuinta - 8297 Bruni 8297
Queue date2023-01-17
Proposed COD2027-09-01